As of September 9, 2001
Two months have now passed since construction started, and there has been much progress. Currently work is
underway to add the remaining windows.
A view showing the curved lower windows and an upper window in place.
|
A view of the curved window from a different perspective.
|
(Click on an image to see a larger version of that picture, and
then use your browser's back button to return to this page.)
The view from the inside through these curved windows.
The next side's windows from the outside.
|
The same windows from the inside with Bill discussing details.
|
The next side's windows from the outside. Note the circular window
on the left
|
A "close-up" of the circular window frame.
|
The photos below show the second floor from the inside.
Floor 2 - Master Bedroom. Currently this is looking west.
|
Floor 2 - Master Bedroom. Currently this is looking east.
|
Floor 2 - This shows part of the storage area on either side of the master bedroom.